The project is located in Aletengxire Town, Yijinhuoluo Banner, Ordos City, Inner Mongolia. It is a key energy security project for the Inner Mongolia Autonomous Region. The construction includes four 580-ton/hour high-temperature, high-pressure coal-fired fluidized bed boilers, paired with four 100 MW-class back-pressure heating steam turbine generator sets. This forms a "heat-determined power" cogeneration model, with a rated heating load of 1056 MW and a maximum heating load of 1330 MW. The No. 2 unit is the first unit of this project to be put into operation.