This second round of NEVI funding focuses on locations south of Interstate 84, including the lower Hudson Valley, New York City, and Long Island.
The competitive Downstate NEVI DCFC Program, administered by the New York State Energy Research and Development Authority (NYSERDA) in partnership with the New York State Department of Transportation (NYSDOT), provides funding to qualified EV infrastructure developers to install and operate DCFC stations at one or more sites along Federal Highway Administration-designated Alternative Fuel Corridors (AFCs).
Proposed sites must meet all federal requirements, including being located within one travel mile of an AFC exit, being publicly accessible 24 hours a day, seven days a week, and having the ability to charge at least four EVs simultaneously at speeds of at least 150 kilowatts per vehicle.
Sites are also required to meet federal uptime requirements for the percentage of time the charging station is functional. Proposals that close gaps between existing and planned charging stations, offer amenities such as restrooms and food, or have stations that provide multiple types of charging connectors (CCS and J3400), will be prioritized.