Search
Oil & Gas
Coal
Thermal Power
Solar
Wind Power
Hydropower
Nuclear Power
Power Grid
Hydrogen
Geothermal
Energy Storage
Energy Efficiency
New Energy Vehicles
Energy Economy
Climate Change
Biomass Energy
Mining and Metailurgy
Transportation
Construction and materials
Chemical industry
Agricultural engineering
Information and Communication
Exhibition & Forum
Belt and Road
Français
Русский
Español
العربية
Português
Deutsch
Akkuyu
Nuclear Power Plant (NPP)
Core Pump Systems Installed at Akkuyu 2
Rosatom has completed the installation of four main circulation pumping units (GTsNA) in the reactor compartment of unit 2 at the Akkuyu Nuclear Power Plant (NP…
Nuclear Power Plant (NPP)
Main Circulation Pumps Installed in Akkuyu’s Second Unit
The Akkuyu nuclear power plant in Turkey’s Mersin province has reached a significant milestone with the installation of the main circulation pump units at…
Nuclear Power Plant (NPP)
Akkuyu 1 Begins Pump Testing
Commissioning has started on the main equipment of the coastal pumping station of unit 1 at the Akkuyu NPP under construction in Türkiye. Rosatom said the …
Nuclear Power Plant (NPP)
Start-up Work Under Way for Akkuyu Pumping Station
Akkuyu is to be Turkey's first nuclear power plantThe start-up and testing phase of the on-shore pumping station for Turkey's Akkuyu nuclear power plant…
Nuclear Power Plant (NPP)
Akkuyu NPP Progresses Despite Equipment Delays
The problems caused by the failure of Germany’s Siemens to deliver key equipment for the Akkuyu NPP under construction in Türkiye have been overcome,…
Nuclear Power Plant (NPP)
Turbine Installed at Akkuyu’s First Unit
The turbine has been installed at unit 1 of the Akkuyu NPP under construction in Türkiye. The event was witnessed by Turkish Minister of Energy & Natural R…
Nuclear Reactor
Turbine Installed at Turkey’s Akkuyu Unit 1
Turbine installation has been completed at the first unit of Turkey's Akkuyu nuclear power plant, paving the way for pre-launch tests and then cold-hot test…
Nuclear Reactor
Concreting Completed For The Containment Dome Of Akkuyu Unit 1
Concreting of the outer containment dome of the first unit at Turkey's Akkuyu nuclear power plant took 104 days, with3511 cubic metres of high-strength self…
Russian Federation
Concreting Completed Of Outer Containment Dome At Akkuyu-1
Akkuyu-1Construction workers at the Akkuyu nuclear power station being built by Russia’s state nuclear corporation in Turkey have completed the concreting…
Nuclear Power Plant (NPP)
Akkuyu 1 Outer Containment Dome Lifted Into Place
The top section of the dome on the outer containment building for Turkey's Akkuyu nuclear power plant's first unit has been installed in its design posi…
Nuclear Power Plant (NPP)
Türkiye Confronts Siemens Over Akkuyu Delays
Source: RosatomTürkiye will take action against the German company Siemens over problems with the supply of equipment for Akkuyu NPP, Turkish Ministry of E…
Nuclear Decommissioning
Akkuyu 3: Concreting Completed of Turbine Unit Foundation
The concrete foundation of the turbine building for Akkuyu unit 3 in Turkey includes a steel reinforcement frame which measures 58.2 metres by 20.4 metres by 5.…
Nuclear Power Plant (NPP)
Akkuyu 1 Outer Containment Dome Takes Shape
The installation in the design position of the lower part of the outer containment dome has been completed at unit 1 of Turkey's Akkuyu nuclear power plant.…
Nuclear Power Plant (NPP)
Akkuyu 3 Gets Fifth Tier of Inner Containment Building
The top section of the cylindrical part of the inner containment building for the third unit at Turkey's Akkuyu nuclear power plant has been installed in pl…
Nuclear Power Plant (NPP)
Akkuyu NPP Specialists Complete Concreting of Foundation Slab of Pump Station of Unit No. 3
Akkuyu NPP specialists complete concreting of foundation slab of pump station of Unit No. 3. (Credit: The State Atomic Energy Corporation ROSATOM)Concreting of …
65 Items
PREV
1
2
3
4
5
NEXT