The system features 314 Ah cells and offers up to 7.5 MWh of energy storage. Its patent-pending architecture breaks away from the industry standard 20-foot container splitting the system into units with more easily transportable weight and dimensions.
Driven by the demand for higher efficiency and cost reduction, grid-scale BESS are increasingly featuring high-capacity cells (3XX Ah and beyond). However, this has given rise to new challenges on the logistics front, particularly on European soil, where there is a limit of 40 tons for vehicles on the roads in many countries.